Power Grid Recharged Brazil/Spain & Portugal

21

Uitverkocht

Ontvang een e-mail als het spel terug in stock is

Toevoegen aan verlanglijst
Toevoegen aan verlanglijst
2, 3, 4, 5, 6 Aantal spelers
Meer dan 60 minuten Gemiddelde speeltijd
12+ Leeftijd
Engels, taalafhankelijk Taal
Niet in spelbib Aanwezig in

Two new expansion maps for Power Grid: Brazil on one side and Spain & Portugal on the other.

In Brazil, power providers prefer biogas for the production of
electricity. Thus, players should consider the garbage power plants as
biogas-fired power plants and the garbage resources as biogas tanks when
playing with the Brazil maps. The fight for scarce resources is intense
and will keep the players focused during the game!

In Spain & Portugal, the interests of power production develop in
two completely opposite directions: Uranium will be much more important
than in other games, however not at the beginning. The resource market
will not get any new uranium at all during »Step 1«, but the supplies of
uranium increase rapidly in »Step 2«. On the other hand, and at the
same time, three large wind-power plants come onto the market. This
clash of interests is intended!

The expansion includes a “Collector’s Box” – a standard sized Power Grid box with space for the other expansion maps that have been released up to 2009.

Reserveer Power Grid Recharged Brazil/Spain & Portugal

Fout: Contact formulier niet gevonden.